RETROFIT PLC AND HMI VSD MCWP A-B UNIT 1 GUNUNG SALAK GEOTHERMAL

Aug-2018

These works were carried out due to a malfunction in the VSD unit 1 PLTP Gunung Salak system spesifically on the HMI and also the PLC. These jobs are carried out to normalize the entire system so that it can operate and support generation operations.

Scope of these projects are :

  • Survey, FO Cable pulling, termination, splicing,link test, labelling, and media converter installation.
  • Re-Engineering HMI VSD and modify PLC program.
  • Testing the work function of fiber optic communication cables and HMI VSD.